Site setup, all phases of civil works

A site is at its most dangerous on the day it is set out, and again on every day it changes.

Construction sites 30–60 min per run

The layout you set on day one is the one people follow for months.

Fences, gates, routes, storage and the crane position are decided quickly, under pressure, by people who will not be walking the site every day. Everything that follows inherits those decisions: deliveries, pedestrians, plant movements, all of it.

This is the longest training in the library, because it covers a whole sequence rather than one moment. It is for site managers and foremen who set a site out and then have to change it while it runs.

What a team does in it

One run, three parts. A team can go back to any of them as often as it needs, and most do.

  1. 1

    Set the site out

    A team places the fence line, the gate, the pedestrian route and the storage area on a plot they have not seen before.

  2. 2

    Live with it

    Deliveries arrive, the excavation opens, a crane goes up. They see what their own layout does once it is under load.

  3. 3

    Change it mid job

    The work moves to the far end. The team rearranges routes and access without leaving a day of chaos behind.

What is included

Construction sites

Site setup, all phases of civil works

30–60 min per run

Included with every module

  • The training itself, repeated as often as you need.
  • Equipment supplied, maintained and replaced.
  • Attendance is recorded and exports into the records you already keep.
  • We run the first sessions with your team, then hand over.

Put it on your shortlist and we go through it together, with nothing to decide yet.

Next to it in the same cluster

Teams that meet this hazard usually meet the others on the same shift. The cluster page Construction sites holds all of them together.

Set out one of your own sites with us.

Bring the layout of a site that is starting soon. We go through the training against it, start to finish.

What happens in the demo

  1. You pick the hazard From your own risk assessment, not from a demo script.
  2. We go through the training Start to finish, the same version your people would get.
  3. We look at your site Who would run it, on which shifts, and what a first group needs.