Isolation, switching, and a climb before it is done.

Three hazard areas cover most of what goes wrong on the network. Here is what they look like at a substation or up a mast, and what a crew can practise without taking anything out of service.

A crew going through a switching step at a substation before work starts

Three areas, and the same job ticket.

Falls from height, hazardous substances and fire, machinery and tools. Your risk assessment lists them separately. On one job they turn up between the isolation and the hand-back.

Of the eight hazard areas, only construction sites kill more people at work than falls from height — 53 in a year. In this industry, going up is not the exception. It is half the job list.

Germany, statutory accident insurance (DGUV)

None of this needs an outage.

A run takes minutes and happens at your own depot. It fits into the gaps a working day already has, and it can be done again as often as a crew needs.

Two workers in high-visibility vests and hard hats going through a printed sheet together before starting work

It fits into the morning, before the vans leave the depot.

Two or three people at a time, at the briefing, on a standby day, in the hour between two jobs. The situation runs for them and ends when they are done. Nothing is switched, isolated or taken out of service for it, and no window has to be booked.

That is what makes repeating it possible. The same situation can be run again before the next shutdown and again a year later, as often as somebody needs it, and it costs the day the same few minutes every time.

Whoever is on the crew this week.

New starters, a contractor crew brought in for a shutdown, people moved across from another region who do not know this installation. They go through the same run as the permanent crew, in the week they arrive.

Every run is written down.

Who took part, on what, and when — by crew and by depot, ready to export into the records you keep anyway. Participation, nothing about how a single person did.

Trainings for work on the network

These are the ones that fit the work at an installation. The time says how long one run takes, from start to finish.

Your shortlist builds itself as you go

One of these three is already saved. Whatever you save here stays in the Shortlist at the top of this page.

See the full library

Bring the risk assessment for one of your installations.

We take one hazard from it — the climb, the room or the equipment — and go through the training that covers it, the same way one of your people would.

What happens in the demo

  1. You pick the hazard From your own risk assessment, not from a demo script.
  2. We go through the training Start to finish, the same version your people would get.
  3. We work out where it fits Which depot, which morning, who runs it, and what a crew going out on standby needs first.